250.424—What are the requirements for prolonged drilling operations?
         If wellbore operations continue for more than 30 days within a casing string run to the surface:
    
    
        
        (a) 
         You must stop drilling operations as soon as practicable, and evaluate the effects of the prolonged operations on continued drilling operations and  the life of the well. At a minimum, you must:
    
    
    
        
        (2) 
         Report the results of your evaluation to the District Manager and obtain approval of those results before resuming operations.