250.433—What are the diverter actuation and testing requirements?
         When you install the diverter system, you must actuate the diverter sealing element, diverter valves, and diverter-control systems and control stations. You must also flow-test the vent lines.
    
    
        
        (a) 
         For drilling operations with a surface wellhead configuration, you must actuate the diverter system at least once every 24-hour period after the initial test. After you have nippled up on conductor casing, you must pressure-test the diverter-sealing element and diverter valves to a minimum of 200 psi. While the diverter is installed, you must conduct subsequent pressure tests within 7 days after the previous test.
    
    
        
        (b) 
         For floating drilling operations with a subsea BOP stack, you must actuate the diverter system within 7 days after the previous actuation.