7.66—Output energy test.
        
        (a) Test procedures.
         The blasting unit shall be tested by firing into each of the following resistive loads, within a tolerance of ±1%:
    
    
    
    
    
        
        (b) Acceptable performance.
        
        (1) 
         The voltage shall be zero at the firing line terminals 10 milliseconds after operation of the firing switch.
    
    
    
    
    
        
        (iii) 
         At least an average of 2 amperes during the first 5 milliseconds following operation of the firing switch.
    
    
        
        (iv) 
         Not exceed an average of 100 amperes during the first 10 milliseconds following operation of the firing switch.