127.609—Dry chemical systems.
        
        (a) 
         Each marine transfer area for LNG must have a dry chemical system that provides at least two dry chemical discharges to the area surrounding the loading arms, one of which must be—
    
    
    
        
        (2) 
         Actuated and, except for pre-aimed monitors, controlled from a location other than the monitor location.
    
    
        
        (b) 
         The dry chemical system must have the capacity to supply simultaneously or sequentially each hose or monitor in the system for 45 seconds.