265.253—Containment.
         If leachate or run-off from a pile is a hazardous waste, then either:
    
    
        
        (a) 
        
        (1) 
         The pile must be placed on an impermeable base that is compatible with the waste under the conditions of treatment or storage;
    
    
        
        (2) 
         The owner or operator must design, construct, operate, and maintain a run-on control system capable of preventing flow onto the active portion of the pile during peak discharge from at least a 25-year storm;
    
    
        
        (3) 
         The owner or operator must design, construct, operate, and maintain a run-off management system to collect and control at least the water volume resulting from a 24-hour, 25-year storm; and
    
    
        
        (4) 
         Collection and holding facilities (e.g., tanks or basins) associated with run-on and run-off control systems must be emptied or otherwise managed expeditiously to maintain design capacity of the system; or
    
    
    
    [Comment: If collected leachate or run-off is discharged through a point source to waters of the United States, it is subject to the requirements of section 402 of the Clean Water Act, as amended.]