270.71—Operation during interim status.
               		
               		
               	 	
               	 	
               	 	
               	 		
    
        
        (a) 
         During the interim status period the facility shall not:
     
    
        
        (1) 
         Treat, store, or dispose of hazardous waste not specified in part A of the permit application;
     
    
        
        (2) 
         Employ processes not specified in part A of the permit application; or
     
    
        
        (3) 
         Exceed the design capacities specified in part A of the permit application.
     
    
        
        (b) 
         Interim status standards. During interim status, owners or operators shall comply with the interim status standards at  40 CFR part 265.