57.301—General requirements.
         Each NSO shall require an interim level of sulfur dioxide constant controls to be operated at the smelter, unless a waiver of this requirement has been granted to the owner under subpart H of this part. Except as otherwise provided in  § 57.304, the interim constant controls shall be properly operated and maintained at all times. The NSO shall require the following gas streams to be treated by interim constant controls:
    
    
        
        (a) 
         In copper smelters, off-gases from fluidized bed roasters, flash furnaces, NORANDA reactors, electric furnaces and copper converters;
    
    
        
        (b) 
         In lead smelters, off-gases from the front end of the sintering machine and any other sinter gases which are recirculated;
    
    
        
        (c) 
         In zinc smelters, off-gases from mult-hearth roasters, flash roasters and fluidized bed roasters; and
    
    
    
        
        (e) 
         In all primary nonferrous smelters, any other process streams which were regularly or intermittently treated by constant controls at the smelter as of August 7, 1977.