93.109—Criteria and procedures for determining conformity of transportation plans, programs, and projects: General.

(a) In order for each transportation plan, program, and FHWA/FTA project to be found to conform, the MPO and DOT must demonstrate that the applicable criteria and procedures in this subpart are satisfied, and the MPO and DOT must comply with all applicable conformity requirements of implementation plans and of court orders for the area which pertain specifically to conformity. The criteria for making conformity determinations differ based on the action under review (transportation plans, TIPs, and FHWA/FTA projects), the relevant pollutant(s), and the status of the implementation plan.
(b) Table 1 in this paragraph indicates the criteria and procedures in §§ 93.110 through 93.119 which apply for transportation plans, TIPs, and FHWA/FTA projects. Paragraphs (c) through (k) of this section explain when the budget, interim emissions, and hot-spot tests are required for each pollutant and NAAQS. Paragraph (l) of this section addresses conformity requirements for areas with approved or adequate limited maintenance plans. Paragraph (m) of this section addresses nonattainment and maintenance areas which EPA has determined have insignificant motor vehicle emissions. Paragraph (n) of this section addresses isolated rural nonattainment and maintenance areas. Table 1 follows:
Table 1—Conformity Criteria
All Actions at all times:
§ 93.110 Latest planning assumptions
§ 93.111 Latest emissions model
§ 93.112 Consultation
Transportation Plan:
§ 93.113(b) TCMs
§ 93.118 or § 93.119 Emissions budget and/or Interim emissions
TIP:
§ 93.113(c) TCMs
§ 93.118 or § 93.119 Emissions budget and/or Interim emissions
Project (From a Conforming Plan and TIP):
§ 93.114 Currently conforming plan and TIP
§ 93.115 Project from a conforming plan and TIP
§ 93.116 CO, PM10, and PM2.5 hot-spots.
§ 93.117 PM10 and PM2.5 control measures
Project (Not From a Conforming Plan and TIP):
§ 93.113(d) TCMs
§ 93.114 Currently conforming plan and TIP
§ 93.116 CO, PM10, and PM2.5 hot-spots.
§ 93.117 PM10 and PM2.5 control measures
§ 93.118 and/or § 93.119 Emissions budget and/or Interim emissions
(c) 1-hour ozone NAAQS nonattainment and maintenance areas. This paragraph applies when an area is nonattainment or maintenance for the 1-hour ozone NAAQS (i.e., until the effective date of any revocation of the 1-hour ozone NAAQS for an area). In addition to the criteria listed in Table 1 in paragraph (b) of this section that are required to be satisfied at all times, in such ozone nonattainment and maintenance areas conformity determinations must include a demonstration that the budget and/or interim emissions tests are satisfied as described in the following:
(1) In all 1-hour ozone nonattainment and maintenance areas the budget test must be satisfied as required by § 93.118 for conformity determinations made on or after:
(i) The effective date of EPA's finding that a motor vehicle emissions budget in a submitted control strategy implementation plan revision or maintenance plan for the 1-hour ozone NAAQS is adequate for transportation conformity purposes;
(ii) The publication date of EPA's approval of such a budget in the Federal Register; or
(iii) The effective date of EPA's approval of such a budget in the Federal Register, if such approval is completed through direct final rulemaking.
(2) In ozone nonattainment areas that are required to submit a control strategy implementation plan revision for the 1-hour ozone NAAQS (usually moderate and above areas), the interim emissions tests must be satisfied as required by § 93.119 for conformity determinations made when there is no approved motor vehicle emissions budget from an applicable implementation plan for the 1-hour ozone NAAQS and no adequate motor vehicle emissions budget from a submitted control strategy implementation plan revision or maintenance plan for the 1-hour ozone NAAQS.
(3) An ozone nonattainment area must satisfy the interim emissions test for NOX, as required by § 93.119, if the implementation plan or plan submission that is applicable for the purposes of conformity determinations is a 15% plan or Phase I attainment demonstration that does not include a motor vehicle emissions budget for NOX. The implementation plan for the 1-hour ozone NAAQS will be considered to establish a motor vehicle emissions budget for NOX if the implementation plan or plan submission contains an explicit NOX motor vehicle emissions budget that is intended to act as a ceiling on future NOX emissions, and the NOX motor vehicle emissions budget is a net reduction from NOX emissions levels in 1990.
(4) Ozone nonattainment areas that have not submitted a maintenance plan and that are not required to submit a control strategy implementation plan revision for the 1-hour ozone NAAQS (usually marginal and below areas) must satisfy one of the following requirements:
(i) The interim emissions tests required by § 93.119; or
(ii) The State shall submit to EPA an implementation plan revision for the 1-hour ozone NAAQS that contains motor vehicle emissions budget(s) and a reasonable further progress or attainment demonstration, and the budget test required by § 93.118 must be satisfied using the adequate or approved motor vehicle emissions budget(s) (as described in paragraph (c)(1) of this section).
(5) Notwithstanding paragraphs (c)(1) and (c)(2) of this section, moderate and above ozone nonattainment areas with three years of clean data for the 1-hour ozone NAAQS that have not submitted a maintenance plan and that EPA has determined are not subject to the Clean Air Act reasonable further progress and attainment demonstration requirements for the 1-hour ozone NAAQS must satisfy one of the following requirements:
(i) The interim emissions tests as required by § 93.119 ;
(ii) The budget test as required by § 93.118, using the adequate or approved motor vehicle emissions budgets in the submitted or applicable control strategy implementation plan for the 1-hour ozone NAAQS (subject to the timing requirements of paragraph (c)(1) of this section); or
(iii) The budget test as required by § 93.118, using the motor vehicle emissions of ozone precursors in the most recent year of clean data as motor vehicle emissions budgets, if such budgets are established by the EPA rulemaking that determines that the area has clean data for the 1-hour ozone NAAQS.
(d) 8-hour ozone NAAQS nonattainment and maintenance areas without motor vehicle emissions budgets for the 1-hour ozone NAAQS for any portion of the 8-hour nonattainment area. This paragraph applies to areas that were never designated nonattainment for the 1-hour ozone NAAQS and areas that were designated nonattainment for the 1-hour ozone NAAQS but that never submitted a control strategy SIP or maintenance plan with approved or adequate motor vehicle emissions budgets. This paragraph applies 1 year after the effective date of EPA's nonattainment designation for the 8-hour ozone NAAQS for an area, according to § 93.102(d). In addition to the criteria listed in Table 1 in paragraph (b) of this section that are required to be satisfied at all times, in such 8-hour ozone nonattainment and maintenance areas conformity determinations must include a demonstration that the budget and/or interim emissions tests are satisfied as described in the following:
(1) In such 8-hour ozone nonattainment and maintenance areas the budget test must be satisfied as required by § 93.118 for conformity determinations made on or after:
(i) The effective date of EPA's finding that a motor vehicle emissions budget in a submitted control strategy implementation plan revision or maintenance plan for the 8-hour ozone NAAQS is adequate for transportation conformity purposes;
(ii) The publication date of EPA's approval of such a budget in the Federal Register; or
(iii) The effective date of EPA's approval of such a budget in the Federal Register, if such approval is completed through direct final rulemaking.
(2) In ozone nonattainment areas that are required to submit a control strategy implementation plan revision for the 8-hour ozone NAAQS (usually moderate and above and certain Clean Air Act, part D, subpart areas), the interim emissions tests must be satisfied as required by § 93.119 for conformity determinations made when there is no approved motor vehicle emissions budget from an applicable implementation plan for the 8-hour ozone NAAQS and no adequate motor vehicle emissions budget from a submitted control strategy implementation plan revision or maintenance plan for the 8-hour ozone NAAQS.
(3) Such an 8-hour ozone nonattainment area must satisfy the interim emissions test for NOX, as required by § 93.119, if the implementation plan or plan submission that is applicable for the purposes of conformity determinations is a 15% plan or other control strategy SIP that addresses reasonable further progress that does not include a motor vehicle emissions budget for NOX. The implementation plan for the 8-hour ozone NAAQS will be considered to establish a motor vehicle emissions budget for NOX if the implementation plan or plan submission contains an explicit NOX motor vehicle emissions budget that is intended to act as a ceiling on future NOX emissions, and the NOX motor vehicle emissions budget is a net reduction from NOX emissions levels in 2002.
(4) Ozone nonattainment areas that have not submitted a maintenance plan and that are not required to submit a control strategy implementation plan revision for the 8-hour ozone NAAQS (usually marginal and certain Clean Air Act, part D, subpart areas) must satisfy one of the following requirements:
(i) The interim emissions tests required by § 93.119; or
(ii) The State shall submit to EPA an implementation plan revision for the 8-hour ozone NAAQS that contains motor vehicle emissions budget(s) and a reasonable further progress or attainment demonstration, and the budget test required by § 93.118 must be satisfied using the adequate or approved motor vehicle emissions budget(s) (as described in paragraph (d)(1) of this section).
(5) Notwithstanding paragraphs (d)(1) and (d)(2) of this section, ozone nonattainment areas with three years of clean data for the 8-hour ozone NAAQS that have not submitted a maintenance plan and that EPA has determined are not subject to the Clean Air Act reasonable further progress and attainment demonstration requirements for the 8-hour ozone NAAQS must satisfy one of the following requirements:
(i) The interim emissions tests as required by § 93.119 ;
(ii) The budget test as required by § 93.118, using the adequate or approved motor vehicle emissions budgets in the submitted or applicable control strategy implementation plan for the 8-hour ozone NAAQS (subject to the timing requirements of paragraph (d)(1) of this section); or
(iii) The budget test as required by § 93.118, using the motor vehicle emissions of ozone precursors in the most recent year of clean data as motor vehicle emissions budgets, if such budgets are established by the EPA rulemaking that determines that the area has clean data for the 8-hour ozone NAAQS.
(e) 8-hour ozone NAAQS nonattainment and maintenance areas with motor vehicle emissions budgets for the 1-hour ozone NAAQS that cover all or a portion of the 8-hour nonattainment area. This provision applies 1 year after the effective date of EPA's nonattainment designation for the 8-hour ozone NAAQS for an area, according to § 93.102(d). In addition to the criteria listed in Table 1 in paragraph (b) of this section that are required to be satisfied at all times, in such 8-hour ozone nonattainment and maintenance areas conformity determinations must include a demonstration that the budget and/or interim emissions tests are satisfied as described in the following:
(1) In such 8-hour ozone nonattainment and maintenance areas the budget test must be satisfied as required by § 93.118 for conformity determinations made on or after:
(i) The effective date of EPA's finding that a motor vehicle emissions budget in a submitted control strategy implementation plan revision or maintenance plan for the 8-hour ozone NAAQS is adequate for transportation conformity purposes;
(ii) The publication date of EPA's approval of such a budget in the Federal Register; or
(iii) The effective date of EPA's approval of such a budget in the Federal Register, if such approval is completed through direct final rulemaking.
(2) Prior to paragraph (e)(1) of this section applying, the following test(s) must be satisfied:
(i) If the 8-hour ozone nonattainment area covers the same geographic area as the 1-hour ozone nonattainment or maintenance area(s), the budget test as required by § 93.118 using the approved or adequate motor vehicle emissions budgets in the 1-hour ozone applicable implementation plan or implementation plan submission;
(ii) If the 8-hour ozone nonattainment area covers a smaller geographic area within the 1-hour ozone nonattainment or maintenance area(s), the budget test as required by § 93.118 for either:
(A) The 8-hour nonattainment area using corresponding portion(s) of the approved or adequate motor vehicle emissions budgets in the 1-hour ozone applicable implementation plan or implementation plan submission where such portion(s) can reasonably be identified through the interagency consultation process required by § 93.105; or
(B) The 1-hour nonattainment area using the approved or adequate motor vehicle emissions budgets in the 1-hour ozone applicable implementation plan or implementation plan submission. If additional emissions reductions are necessary to meet the budget test for the 8-hour ozone NAAQS in such cases, these emissions reductions must come from within the 8-hour nonattainment area;
(iii) If the 8-hour ozone nonattainment area covers a larger geographic area and encompasses the entire 1-hour ozone nonattainment or maintenance area(s):
(A) The budget test as required by § 93.118 for the portion of the 8-hour ozone nonattainment area covered by the approved or adequate motor vehicle emissions budgets in the 1-hour ozone applicable implementation plan or implementation plan submission; and
(B) The interim emissions tests as required by § 93.119 for either: the portion of the 8-hour ozone nonattainment area not covered by the approved or adequate budgets in the 1-hour ozone implementation plan, the entire 8-hour ozone nonattainment area, or the entire portion of the 8-hour ozone nonattainment area within an individual state, in the case where separate 1-hour SIP budgets are established for each state of a multi-state 1-hour nonattainment or maintenance area;
(iv) If the 8-hour ozone nonattainment area partially covers a 1-hour ozone nonattainment or maintenance area(s):
(A) The budget test as required by § 93.118 for the portion of the 8-hour ozone nonattainment area covered by the corresponding portion of the approved or adequate motor vehicle emissions budgets in the 1-hour ozone applicable implementation plan or implementation plan submission where they can be reasonably identified through the interagency consultation process required by § 93.105; and
(B) The interim emissions tests as required by § 93.119, when applicable, for either: the portion of the 8-hour ozone nonattainment area not covered by the approved or adequate budgets in the 1-hour ozone implementation plan, the entire 8-hour ozone nonattainment area, or the entire portion of the 8-hour ozone nonattainment area within an individual state, in the case where separate 1-hour SIP budgets are established for each state in a multi-state 1-hour nonattainment or maintenance area.
(3) Such an 8-hour ozone nonattainment area must satisfy the interim emissions test for NOX, as required by § 93.119, if the only implementation plan or plan submission that is applicable for the purposes of conformity determinations is a 15% plan or other control strategy SIP that addresses reasonable further progress that does not include a motor vehicle emissions budget for NOX. The implementation plan for the 8-hour ozone NAAQS will be considered to establish a motor vehicle emissions budget for NOX if the implementation plan or plan submission contains an explicit NOX motor vehicle emissions budget that is intended to act as a ceiling on future NOX emissions, and the NOX motor vehicle emissions budget is a net reduction from NOX emissions levels in 2002. Prior to an adequate or approved NOX motor vehicle emissions budget in the implementation plan submission for the 8-hour ozone NAAQS, the implementation plan for the 1-hour ozone NAAQS will be considered to establish a motor vehicle emissions budget for NOX if the implementation plan contains an explicit NOX motor vehicle emissions budget that is intended to act as a ceiling on future NOX emissions, and the NOX motor vehicle emissions budget is a net reduction from NOX emissions levels in 1990.
(4) Notwithstanding paragraphs (e)(1) and (e)(2) of this section, ozone nonattainment areas with three years of clean data for the 8-hour ozone NAAQS that have not submitted a maintenance plan and that EPA has determined are not subject to the Clean Air Act reasonable further progress and attainment demonstration requirements for the 8-hour ozone NAAQS must satisfy one of the following requirements:
(i) The budget test and/or interim emissions tests as required by §§ 93.118 and 93.119 and as described in paragraph (e)(2) of this section;
(ii) The budget test as required by § 93.118, using the adequate or approved motor vehicle emissions budgets in the submitted or applicable control strategy implementation plan for the 8-hour ozone NAAQS (subject to the timing requirements of paragraph (e)(1) of this section); or
(iii) The budget test as required by § 93.118, using the motor vehicle emissions of ozone precursors in the most recent year of clean data as motor vehicle emissions budgets, if such budgets are established by the EPA rulemaking that determines that the area has clean data for the 8-hour ozone NAAQS.
(f) CO nonattainment and maintenance areas. In addition to the criteria listed in Table 1 in paragraph (b) of this section that are required to be satisfied at all times, in CO nonattainment and maintenance areas conformity determinations must include a demonstration that the hot-spot, budget and/or interim emissions tests are satisfied as described in the following:
(1) FHWA/FTA projects in CO nonattainment or maintenance areas must satisfy the hot spot test required by § 93.116(a) at all times. Until a CO attainment demonstration or maintenance plan is approved by EPA, FHWA/FTA projects must also satisfy the hot spot test required by § 93.116(b).
(2) In CO nonattainment and maintenance areas the budget test must be satisfied as required by § 93.118 for conformity determinations made on or after:
(i) The effective date of EPA's finding that a motor vehicle emissions budget in a submitted control strategy implementation plan revision or maintenance plan is adequate for transportation conformity purposes;
(ii) The publication date of EPA's approval of such a budget in the Federal Register; or
(iii) The effective date of EPA's approval of such a budget in the Federal Register, if such approval is completed through direct final rulemaking.
(3) Except as provided in paragraph (f)(4) of this section, in CO nonattainment areas the interim emissions tests must be satisfied as required by § 93.119 for conformity determinations made when there is no approved motor vehicle emissions budget from an applicable implementation plan and no adequate motor vehicle emissions budget from a submitted control strategy implementation plan revision or maintenance plan.
(4) CO nonattainment areas that have not submitted a maintenance plan and that are not required to submit an attainment demonstration (e.g., moderate CO areas with a design value of 12.7 ppm or less or not classified CO areas) must satisfy one of the following requirements:
(i) The interim emissions tests required by § 93.119; or
(ii) The State shall submit to EPA an implementation plan revision that contains motor vehicle emissions budget(s) and an attainment demonstration, and the budget test required by § 93.118 must be satisfied using the adequate or approved motor vehicle emissions budget(s) (as described in paragraph (f)(2) of this section).
(g) PM 10 nonattainment and maintenance areas. In addition to the criteria listed in Table 1 in paragraph (b) of this section that are required to be satisfied at all times, in PM10 nonattainment and maintenance areas conformity determinations must include a demonstration that the hot-spot, budget and/or interim emissions tests are satisfied as described in the following:
(1) FHWA/FTA projects in PM10 nonattainment or maintenance areas must satisfy the hot spot test required by § 93.116(a).
(2) In PM10 nonattainment and maintenance areas where a budget is submitted for the 24-hour PM10 NAAQS, the budget test must be satisfied as required by § 93.118 for conformity determinations made on or after:
(i) The effective date of EPA's finding that a motor vehicle emissions budget in a submitted control strategy implementation plan revision or maintenance plan is adequate for transportation conformity purposes;
(ii) The publication date of EPA's approval of such a budget in the Federal Register; or
(iii) The effective date of EPA's approval of such a budget in the Federal Register, if such approval is completed through direct final rulemaking.
(3) Prior to paragraph (g)(2) of this section applying, the budget test must be satisfied as required by § 93.118 using the approved or adequate motor vehicle emissions budget established for the revoked annual PM10 NAAQS, if such a budget exists.
(4) In PM10 nonattainment areas the interim emissions tests must be satisfied as required by § 93.119 for conformity determinations made:
(i) If there is no approved motor vehicle emissions budget from an applicable implementation plan and no adequate motor vehicle emissions budget from a submitted control strategy implementation plan revision or maintenance plan; or
(ii) If the submitted implementation plan revision is a demonstration of impracticability under CAA section 189(a)(1)(B)(ii) and does not demonstrate attainment.
(h) NO 2 nonattainment and maintenance areas. In addition to the criteria listed in Table 1 in paragraph (b) of this section that are required to be satisfied at all times, in NO2 nonattainment and maintenance areas conformity determinations must include a demonstration that the budget and/or interim emissions tests are satisfied as described in the following:
(1) In NO2 nonattainment and maintenance areas the budget test must be satisfied as required by § 93.118 for conformity determinations made on or after:
(i) The effective date of EPA's finding that a motor vehicle emissions budget in a submitted control strategy implementation plan revision or maintenance plan is adequate for transportation conformity purposes;
(ii) The publication date of EPA's approval of such a budget in the Federal Register; or
(iii) The effective date of EPA's approval of such a budget in the Federal Register, if such approval is completed through direct final rulemaking.
(2) In NO2 nonattainment areas the interim emissions tests must be satisfied as required by § 93.119 for conformity determinations made when there is no approved motor vehicle emissions budget from an applicable implementation plan and no adequate motor vehicle emissions budget from a submitted control strategy implementation plan revision or maintenance plan.
(i) 1997 PM 2.5 NAAQS nonattainment and maintenance areas. In addition to the criteria listed in Table 1 in paragraph (b) of this section that are required to be satisfied at all times, in such 1997 PM2.5 nonattainment and maintenance areas conformity determinations must include a demonstration that the budget and/or interim emissions tests are satisfied as described in the following:
(1) FHWA/FTA projects in such 1997 PM2.5 nonattainment or maintenance areas must satisfy the appropriate hot-spot test required by § 93.116(a).
(2) In such 1997 PM2.5 nonattainment and maintenance areas the budget test must be satisfied as required by § 93.118 for conformity determinations made on or after:
(i) The effective date of EPA's finding that a motor vehicle emissions budget in a submitted control strategy implementation plan revision or maintenance plan is adequate for transportation conformity purposes;
(ii) The publication date of EPA's approval of such a budget in the Federal Register; or
(iii) The effective date of EPA's approval of such a budget in the Federal Register, if such approval is completed through direct final rulemaking.
(3) In such 1997 PM2.5 nonattainment areas the interim emissions tests must be satisfied as required by § 93.119 for conformity determinations made if there is no approved motor vehicle emissions budget from an applicable implementation plan and no adequate motor vehicle emissions budget from a submitted control strategy implementation plan revision or maintenance plan.
(j) 2006 PM 2.5 NAAQS nonattainment and maintenance areas without 1997 PM 2.5 NAAQS motor vehicle emissions budgets for any portion of the 2006 PM 2.5 NAAQS area. In addition to the criteria listed in Table 1 in paragraph (b) of this section that are required to be satisfied at all times, in such 2006 PM2.5 nonattainment and maintenance areas conformity determinations must include a demonstration that the budget and/or interim emissions tests are satisfied as described in the following:
(1) FHWA/FTA projects in such PM2.5 nonattainment and maintenance areas must satisfy the appropriate hot-spot test required by § 93.116(a).
(2) In such PM2.5 nonattainment and maintenance areas the budget test must be satisfied as required by § 93.118 for conformity determinations made on or after:
(i) The effective date of EPA's finding that a motor vehicle emissions budget in a submitted control strategy implementation plan revision or maintenance plan for the 2006 PM2.5 NAAQS is adequate for transportation conformity purposes;
(ii) The publication date of EPA's approval of such a budget in the Federal Register; or
(iii) The effective date of EPA's approval of such a budget in the Federal Register, if such approval is completed through direct final rulemaking.
(3) In such PM2.5 nonattainment areas the interim emissions tests must be satisfied as required by § 93.119 for conformity determinations made if there is no approved motor vehicle emissions budget from an applicable implementation plan for the 2006 PM2.5 NAAQS and no adequate motor vehicle emissions budget from a submitted control strategy implementation plan revision or maintenance plan for the 2006 PM2.5 NAAQS.
(k) 2006 PM 2.5 NAAQS nonattainment and maintenance areas with motor vehicle emissions budgets for the 1997 PM 2.5 NAAQS that cover all or a portion of the 2006 PM 2.5 nonattainment area. In addition to the criteria listed in Table 1 in paragraph (b) of this section that are required to be satisfied at all times, in such 2006 PM2.5 nonattainment and maintenance areas conformity determinations must include a demonstration that the budget and/or interim emissions tests are satisfied as described in the following:
(1) FHWA/FTA projects in such PM2.5 nonattainment and maintenance areas must satisfy the appropriate hot-spot test required by § 93.116(a).
(2) In such PM2.5 nonattainment and maintenance areas the budget test must be satisfied as required by § 93.118 for conformity determinations made on or after:
(i) The effective date of EPA's finding that a motor vehicle emissions budget in a submitted control strategy implementation plan revision or maintenance plan for the 2006 PM2.5 NAAQS is adequate for transportation conformity purposes;
(ii) The publication date of EPA's approval of such a budget in the Federal Register; or
(iii) The effective date of EPA's approval of such a budget in the Federal Register, if such approval is completed through direct final rulemaking.
(3) Prior to paragraph (k)(2) of this section applying, the following test(s) must be satisfied:
(i) If the 2006 PM2.5 nonattainment area covers the same geographic area as the 1997 PM2.5 nonattainment or maintenance area(s), the budget test as required by § 93.118 using the approved or adequate motor vehicle emissions budgets in the 1997 PM2.5 applicable implementation plan or implementation plan submission;
(ii) If the 2006 PM2.5 nonattainment area covers a smaller geographic area within the 1997 PM2.5 nonattainment or maintenance area(s), the budget test as required by § 93.118 for either:
(A) The 2006 PM2.5 nonattainment area using corresponding portion(s) of the approved or adequate motor vehicle emissions budgets in the 1997 PM2.5 applicable implementation plan or implementation plan submission where such portion(s) can reasonably be identified through the interagency consultation process required by § 93.105; or
(B) The 1997 PM2.5 nonattainment area using the approved or adequate motor vehicle emissions budgets in the 1997 PM2.5 applicable implementation plan or implementation plan submission. If additional emissions reductions are necessary to meet the budget test for the 2006 PM2.5 NAAQS in such cases, these emissions reductions must come from within the 2006 PM2.5 nonattainment area;
(iii) If the 2006 PM2.5 nonattainment area covers a larger geographic area and encompasses the entire 1997 PM2.5 nonattainment or maintenance area(s):
(A) The budget test as required by § 93.118 for the portion of the 2006 PM2.5 nonattainment area covered by the approved or adequate motor vehicle emissions budgets in the 1997 PM2.5 applicable implementation plan or implementation plan submission; and the interim emissions tests as required by § 93.119 for either: the portion of the 2006 PM2.5 nonattainment area not covered by the approved or adequate budgets in the 1997 PM2.5 implementation plan, the entire 2006 PM2.5 nonattainment area, or the entire portion of the 2006 PM2.5 nonattainment area within an individual state, in the case where separate 1997 PM2.5 SIP budgets are established for each state of a multi-state 1997 PM2.5 nonattainment or maintenance area; or
(B) The budget test as required by § 93.118 for the entire 2006 PM2.5 nonattainment area using the approved or adequate motor vehicle emissions budgets in the applicable 1997 PM2.5 implementation plan or implementation plan submission.
(iv) If the 2006 PM2.5 nonattainment area partially covers a 1997 PM2.5 nonattainment or maintenance area(s):
(A) The budget test as required by § 93.118 for the portion of the 2006 PM2.5 nonattainment area covered by the corresponding portion of the approved or adequate motor vehicle emissions budgets in the 1997 PM2.5 applicable implementation plan or implementation plan submission where they can be reasonably identified through the interagency consultation process required by § 93.105; and
(B) The interim emissions tests as required by § 93.119, when applicable, for either: The portion of the 2006 PM2.5 nonattainment area not covered by the approved or adequate budgets in the 1997 PM2.5 implementation plan, the entire 2006 PM2.5 nonattainment area, or the entire portion of the 2006 PM2.5 nonattainment area within an individual state, in the case where separate 1997 PM2.5 SIP budgets are established for each state in a multi-state 1997 PM2.5 nonattainment or maintenance area.
(l) Areas with limited maintenance plans. Notwithstanding the other paragraphs of this section, an area is not required to satisfy the regional emissions analysis for § 93.118 and/or § 93.119 for a given pollutant and NAAQS, if the area has an adequate or approved limited maintenance plan for such pollutant and NAAQS. A limited maintenance plan would have to demonstrate that it would be unreasonable to expect that such an area would experience enough motor vehicle emissions growth for a NAAQS violation to occur. A conformity determination that meets other applicable criteria in Table 1 of paragraph (b) of this section is still required, including the hot-spot requirements for projects in CO, PM10, and PM2.5 areas.
(m) Areas with insignificant motor vehicle emissions. Notwithstanding the other paragraphs in this section, an area is not required to satisfy a regional emissions analysis for § 93.118 and/or § 93.119 for a given pollutant/precursor and NAAQS, if EPA finds through the adequacy or approval process that a SIP demonstrates that regional motor vehicle emissions are an insignificant contributor to the air quality problem for that pollutant/precursor and NAAQS. The SIP would have to demonstrate that it would be unreasonable to expect that such an area would experience enough motor vehicle emissions growth in that pollutant/precursor for a NAAQS violation to occur. Such a finding would be based on a number of factors, including the percentage of motor vehicle emissions in the context of the total SIP inventory, the current state of air quality as determined by monitoring data for that NAAQS, the absence of SIP motor vehicle control measures, and historical trends and future projections of the growth of motor vehicle emissions. A conformity determination that meets other applicable criteria in Table 1 of p