176.804—Machinery.
         At each initial and subsequent inspection for certification of a vessel, the owner or managing operator shall be prepared to conduct tests and have the vessel ready for inspections of machinery, fuel, and piping systems, including the following:
    
    
    
        
        (b) 
         Operational test and inspection of engine control mechanisms including primary and alternate means of starting machinery;
    
    
        
        (c) 
         Inspection of all machinery essential to the routine operation of the vessel including generators and cooling systems;
    
    
    
    
        
        (f) 
         Operational test of all valves in fuel lines by operating locally and at remote operating positions;
    
    
        
        (g) 
         Operational test of all overboard discharge and intake valves and watertight bulkhead pipe penetration valves;