§ 14-249-104 - Employment of inspector.
               	 		
14-249-104.    Employment of inspector.
    (a)  The  board of commissioners of any sewer district may employ an inspector  and fix the inspector's compensation, which shall be a portion of each  connection fee collected.
(b)  The  inspector shall make an inspection after the party making the connection  has excavated down to the sewer main but before the sewer main is  tapped, and then the inspector shall make a second inspection after the  tap or connection is made to the sewer main but before the section of  the sewer main, which is tapped, is backfilled with earth, so that the  inspector can see that the connection is properly made and well cemented  in place.
(c)  Where two (2) or more  sewer districts embrace an area that is adjacent to or overlapped by  the various sewer districts, the boards of the several sewer districts  may jointly employ an inspector who shall look after connections on the  lines of the different sewer systems by which he is employed, in which  case, the permit issued shall show not only the location of the  connection to be made, for which the permit was issued, but on the lines  of what sewer district the connection is to be made.