§ 15-57-402 - Definitions.
               	 		
15-57-402.    Definitions.
    As used in this subchapter:
      (1)  "Active" means a quarry wall where extraction is occurring or is planned to occur;
      (2)  "Affected  land" means the area of land to the nearest acre, where the quarrying  of stone, industrial activity, and the stockpiling of topsoil and spoil  occur;
      (3)  "Citation" means a  written warning of a violation that may be accompanied by a fine when  given two (2) times for the same violation;
      (4)  "Commission"  means the Arkansas Pollution Control and Ecology Commission, or such  commission or other entity as may lawfully succeed to the powers and  duties of the commission;
      (5)  "Default"  means an operation that has uncorrected violations of the requirements  of this subchapter which allows the Arkansas Department of Environmental  Quality to forfeit the bond to have the site reclaimed as per the  reclamation plan;
      (6)  "Department"  means the Arkansas Department of Environmental Quality or such  department or other entity which may lawfully succeed to the powers and  duties of the department;
      (7)  "Director" means the executive head and active administrator of the Arkansas Department of Environmental Quality;
      (8)  "Exhausted quarry" means a quarry where the stone is depleted;
      (9)  "Fee"  means the notification or annual operating payment made by the operator  to the department. The amount cannot be changed except by legislative  action. This fee will be payable on or before July 1 for all operating  quarries in the current calendar year;
      (10)  "Final floor" means the bottom surface created in a quarry;
      (11)  "Final wall" means the last wall created in a quarry;
      (12)  "Fine"  means a penalty for noncompliance which may accompany a second  citation, except as provided in other sections of this subchapter for  specific violations. Fines are not retroactive, and the amounts cannot  be changed except by legislative action;
      (13)  "Inactive status" means the period of time a quarry is inactive or temporarily shutdown;
      (14)  "Notification  of intent" is the operator's proper notification to the department of  the operator's intent to open a quarry, to temporarily close a quarry,  to reactivate a quarry, and to shut down an exhausted quarry;
      (15)  "Notification in process" means that a notification of intent is on file and incomplete;
      (16)  "Operator" means any person engaged in or controlling a quarrying operation;
      (17)  "Quarry" means an excavation or pit from which stone is removed;
      (18)  The "quarry rim" means the top surface of the quarry behind the wall from which has been removed the topsoil and spoil;
      (19)  "Reclamation  plan" is a plan presented to the department by an operator detailing  the reclamation and revegetation of lands affected by quarrying both  contemporaneously and after the quarry is exhausted, and required by  this subchapter;
      (20)  "Spoil"  means the unconsolidated boulders, soil and other naturally occurring  materials which lie above a deposit of quarriable stone, which must be  excavated from above a deposit so that extraction can begin;
      (21)  "Start-up" means the date an operator begins site preparation for quarrying; and
      (22)  "Topsoil"  means the top strata of soil normally associated with the growth of  vegetation. It is generally free of boulders, cobbles, or other floating  rock and exhibits the growing properties normally associated with, at a  minimum, the pasturing of cattle.