§ 15-58-403 - Costs of projects.
               	 		
15-58-403.    Costs of projects.
    The costs for each proposed project under the abandoned mine reclamation program shall include:
      (1)  Actual construction costs;
      (2)  Actual operation and maintenance costs of permanent facilities;
      (3)  Planning and engineering costs;
      (4)  Construction inspection costs; and
      (5)  Other necessary administrative expenses.