§ 17-50-311 - Fees.
               	 		
17-50-311.    Fees.
    (a)  The Commission on Water Well Construction shall establish and collect fees not to exceed the maximum amounts as follows:
      (1)  Contractor's license -- well drilling ..................... $200.00
      (2)  Contractor's license -- pump installer ..................... 200.00
      (3)  Contractor's license - well drilling and pump installer ..................... 400.00
      (4)  Rig permit fee ..................... 160.00
      (5)  Registration fee -- well driller ..................... 150.00
      (6)  Registration fee -- pump installer ......................150.00
      (7)  Registration fee -- apprentice ......................150.00
(b)  The  commission shall not reduce fees for any license or rig permit even  though it may be valid for less than a full license or permit year.
(c)  The  commission is authorized to establish and receive fees for the cost  incurred in rendering services and material, provided the fees reflect  the reasonable cost to the commission. The commission shall establish  the fees as set forth in the Arkansas Administrative Procedure Act,     25-15-201 et seq.
(d)  The commission shall have the authority to set fees not to exceed the maximums set in subsection (a) of this section.