§ 20-23-314
               	 		
Second of 2 versions of this section
20-23-314.    Pressure piping inspections.
    (a)  The  installation of pressure piping shall be periodically inspected during  the course of the installation by an inspector commissioned pursuant to  the provisions of    20-23-401 in the manner and with the frequency  prescribed by the rules and regulations of the Boiler Inspection  Division.
(b)    (1)  Upon  completion of the installation of any pressure piping, a final  inspection shall be made, and the inspector shall complete a final  inspection report on a form approved by the Director of the Department  of Labor.
      (2)  A copy of the final  inspection report shall be filed with the division within thirty (30)  days of completion of the installation.
(c)  If  the report required by subsection (b) of this section is not filed  within thirty (30) days after completion of the installation, the  division shall designate an inspector in its employ to make the  inspection and report required by subsection (b) of this section.
(d)  The  inspections and reports required by subsections (a) and (b) of this  section may be made by an inspector in the employ of the division.
(e)  For  each inspection made by an inspector employed by the division and  required by subsection (a), subsection (b), or subsection (c) of this  section, the holder of the installation permit shall pay the division an  inspection fee in the amount of four hundred forty dollars ($440) per  day or two hundred twenty dollars ($220) per half-day, plus expenses and  mileage at the rates authorized for employees of the Department of  Labor who furnish their own transportation.
(f)  The  inspections required by this section and the installation permit  required for pressure piping by    20-23-307 shall apply only to new  installations and shall not be construed as requiring an inspection or  an installation permit for maintenance, repair, or renovation of  existing facilities.