§ 23-3-704 - Basis of rate determination -- Waiver of avoided cost standard.
               	 		
23-3-704.    Basis of rate determination -- Waiver of avoided cost standard.
    (a)  A  determination of the avoided energy cost rate or rates for the electric  utility shall be based on the electric utility's estimated avoided cost  of producing or purchasing electrical energy during the time period of  the purchase of electrical energy from the qualifying facility. It shall  not be based upon the production or purchase of electrical energy at  any time other than during the time period of the purchasing of  electrical energy from the qualifying facility. A determination of the  avoided capacity cost rate or rates for the electric utility shall be  based at the electric utility's cost of capacity additions or purchases  avoided during the time period of the purchase of electrical capacity  from the qualifying facility. It shall not be based upon the purchase of  electrical capacity at any time other than during the time period of  the purchase of electrical capacity from the qualifying facility.
(b)    (1)  In  the event the Arkansas Public Service Commission finds and determines  that the avoided cost rate is not necessary to encourage the appropriate  amount of construction of qualifying facilities and that a rate less  than the avoided cost rate is just and reasonable to the electric  consumer of the electric utility, is in the public interest, and will  not discriminate against qualifying facilities, the Arkansas Public  Service Commission shall take all reasonable and appropriate steps to  obtain a waiver of the avoided cost standard from the Federal Energy  Regulatory Commission or any successor agency.
      (2)  In addition, a determination of the avoided cost rate or rates for energy or capacity purchased by an electric utility shall:
            (A)  Be just and reasonable to the electric consumer of the electric utility and in the public interest; and
            (B)  Not discriminate against qualifying cogeneration and small power production facilities.
(c)  Nothing in this subsection requires any electric utility to pay more than the avoided costs for purchases.