459A.205 - PERMIT REQUIREMENTS -- SETTLED OPEN FEEDLOT EFFLUENT BASINS AND ALTERNATIVE TECHNOLOGY SYSTEMS.

        459A.205  PERMIT REQUIREMENTS -- SETTLED OPEN FEEDLOT      EFFLUENT BASINS AND ALTERNATIVE TECHNOLOGY SYSTEMS.         1.  The department shall approve or disapprove applications for      permits for the construction, including the expansion, of settled      open feedlot effluent basins and alternative technology systems, as      provided in this chapter.  The department's decision to approve or      disapprove a permit for the construction of a basin or alternative      system shall be based on whether the application is submitted      according to procedures and standards required by this chapter.  A      person shall not begin construction of a basin or alternative system      requiring a permit under this section, unless the department first      approves the person's application and issues to the person a      construction permit.         2.  The department shall issue a construction permit upon approval      of an application.  The department shall approve the application      regardless of whether the applicant is required to be issued a      construction permit.         3.  The department shall not approve an application for a      construction permit unless the applicant submits all of the      following:         a.  For an open feedlot operation submitting an application      for a construction permit on or after April 30, 2007, a nutrient      management plan as provided in section 459A.208.         b.  An engineering report, construction plans, and      specifications prepared by a licensed professional engineer or the      natural resources conservation service of the United States      department of agriculture certifying that the construction of the      settled open feedlot effluent basin or alternative technology system      complies with the construction design standards required in this      chapter.         4.  An open feedlot operation must be issued a construction permit      prior to any of the following:         a.  The construction, including expansion, of a settled open      feedlot effluent basin or alternative technology system if the open      feedlot operation is required to be issued an operating permit.         b.  The department has previously issued the open feedlot      operation a construction permit and any of the following applies:         (1)  The animal unit capacity of the open feedlot operation will      be increased to more than the animal unit capacity approved by the      department in the previous construction permit.         (2)  The volume of open feedlot effluent stored at the open      feedlot operation would be more than the volume approved by the      department in the previous construction permit.         (3)  The open feedlot operation was discontinued for twenty-four      months or more and the animal unit capacity would be one thousand      animal units or more.         5.  Prior to submitting an application for a construction permit      the applicant may submit a conceptual design and site investigation      report to the department for review and comment.         6.  The application for the construction permit shall include all      of the following:         a.  The name of the owner of the open feedlot operation and      the name of the open feedlot operation, including a mailing address      and telephone number for the owner and the operation.         b.  The name of the contact person for the open feedlot      operation, including the person's mailing address and telephone      number.         c.  The location of the open feedlot operation.         d.  A statement providing that the application is for any of      the following:         (1)  The construction or expansion of a settled open feedlot      effluent basin or alternative technology system for an existing open      feedlot operation which is not expanding.         (2)  The construction or expansion of a settled open feedlot      effluent basin or alternative technology system for an existing open      feedlot operation which is expanding.         (3)  The construction of a settled open feedlot effluent basin or      alternative technology system for a proposed new open feedlot      operation.         e.  The animal unit capacity for each animal species in the      open feedlot operation before and after the proposed construction.         f.  An engineering report, construction plans, and      specifications prepared by a licensed professional engineer or by the      United States natural resources conservation service, for the settled      open feedlot operation effluent basin or alternative technology      system.         g.  A soils and hydrogeologic report of the site, as required      in section 459A.206.         h.  Information, including but not limited to maps, drawings,      and aerial photos that clearly show the location of all of the      following:         (1)  The open feedlot operation and all existing and proposed      settled open feedlot effluent basins or alternative technology      systems, clean water diversions, and other pertinent features or      structures.         (2)  Any other open feedlot operation under common ownership or      common management and located within one thousand two hundred fifty      feet of the open feedlot operation.         (3)  A public water supply system as defined in section 455B.171      or a drinking water well which is located within a distance from the      operation as prescribed by rules adopted by the department.         i.  For an open feedlot operation implementing an alternative      technology system as provided in section 459A.303, the applicant      shall submit all of the following:         (1)  Information showing that the proposed open feedlot operation      meets criteria for siting as established by rules adopted by the      department.  However, if the site does not meet the criteria, the      information shall show substantially equivalent alternatives to      meeting such criteria.         (2)  The results of predictive computer modeling for the proposed      alternative technology system to determine suitability of the      proposed site for the system and to predict performance of the      alternative technology system as compared to the use of a settled      open feedlot effluent basin.         (3)  A conceptual design of the proposed alternative technology      system, as developed by a licensed engineer.         7. a.  Except as provided in paragraph "b", a construction      permit for an open feedlot operation expires as follows:         (1)  If construction does not begin within one year after the date      the construction permit is issued.         (2)  If construction is not completed within three years after the      date the construction permit is issued.         b.  If requested, the department may grant an extension of      time to begin or complete construction upon a showing of just cause      by the construction permit applicant.         8.  The department may suspend or revoke a construction permit,      modify the terms or conditions of a construction permit, or      disapprove a request to extend the time to begin or complete      construction as provided in this section, if it determines that the      operation of the open feedlot operation constitutes a clear, present,      and impending danger to public health or the environment.         9.  This section does not require a person to be issued a permit      to construct a settled open feedlot effluent basin or alternative      technology system if the basin or system is part of an open feedlot      operation which is owned by a research college conducting research      activities as provided in section 459A.105.  
         Section History: Recent Form
         2005 Acts, ch 136, §7; 2006 Acts, ch 1088, §3, 6         Referred to in § 459A.102, 459A.201, 459A.206, 459A.207, 459A.208,      459A.301, 459A.302 
         Footnotes
         2006 amendment to subsection 3, paragraph a, takes effect April      26, 2006, and applies retroactively to February 13, 2006; 2006 Acts,      ch 1088, §6