54-18-201 - Public utility to obtain approval for high voltage power lines.
               	 		 54-18-201.    Public utility to obtain approval for high voltage power lines.
      (1)  Except as provided in Subsections (2) and (3), a public utility shall comply with therequirements of this chapter before beginning construction or operation of:
      (a)  a high voltage power line; or
      (b)  an upgraded high voltage power line.
      (2)  A public utility is not subject to the provisions of this chapter if the public utility hason or before May 12, 2009:
      (a)  filed an application for or obtained a certificate of convenience and necessity for ahigh voltage power line in accordance with the provisions of Section 54-4-25; or
      (b)  has initiated the acquisition of right-of-way for the construction of the high voltagetransmission line.
      (3)  A transmission line that is subject to federal permitting is not subject to theprovisions of this chapter.
Enacted by Chapter 316, 2009 General Session