      (1)  The board shall review the location and availability of renewable energy sourcesserving electric loads in the state.
      (2)  The board shall:
      (a)  determine if there is adequate transmission infrastructure and capacity to bringrenewable energy sources to market;
      (b)  prioritize transmission projects on the basis of:
      (i)  location;
      (ii)  supporting potential renewable energy source development;
      (iii)  feasibility of development; and
      (iv)  economic development factors; and
      (c)  provide available funding to develop energy resource plans to provide for connectingto transmission lines a renewable energy source, including development of an integrated resourceplan.